Abstract

With increased reliance on cyber infrastructure, large scale power networks face new challenges owing to computational scalability. In this paper we focus on developing an asynchronous decentralized solution framework for the Unit Commitment(UC) problem for large scale power networks. We exploit the inherent asynchrony in a region based decomposition arising out of imbalance in regional subproblems to boost computational efficiency. A two phase algorithm is proposed that relies on the convex relaxation and privacy preserving valid inequalities in order to deliver algorithmic improvements. Our algorithm employs a novel interleaved binary mechanism that locally switches from the convex subproblem to its binary counterpart based on consistent local convergent behavior. We develop a high performance computing (HPC) oriented software framework that uses Message Passing Interface (MPI) to drive our benchmark studies. Our simulations performed on the IEEE 3012 bus case are benchmarked against the centralized and a state of the art synchronous decentralized method. The results demonstrate that the asynchronous method improves computational efficiency by a significant amount and provides a competitive solution quality rivaling the benchmark methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.