Abstract

The early-time transient flow during the start-up of fluid production from a porous medium by a well intersected by a vertical elliptical hydraulic fracture is studied using an asymptotic analysis. The analysis is focused on the situation of practical interest where the fracture conductivity is high so that production from the fracture dominates. The first three terms in a short-time asymptotic expansion for the production rate during constant-pressure production, and for the well-pressure during constant-rate production, are obtained. It is shown that the fracture tip starts to influence the production rate only when the dimensionless time is increased to the square of the reciprocal of the dimensionless fracture conductivity. The asymptotic results also show that geometric factors of an elliptical fracture introduce non-negligible corrections to the so-called bilinear flow in the early times, which were previously erroneously associated with the effect of the fracture tip.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.