Abstract

Bangladesh Road Transport Authority announced a plan to build a bridge over the Lohalia River in Boga, Patuakhali, which will significantly modify the entire communication system and lead to significant economic empowerment in the southeastern part of Bangladesh. This study was designed to help decision-makers through the identification and evaluation of all potential social and environmental consequences of this proposed project using an integrated methodology combining GIS mapping, environmental impact value assessment, and critical evaluation of the environmental impact through the Leopold matrix. The necessary information required for this study has been collected through questionnaire surveys, participatory community risk assessments (CRA), focused group discussions, key informant interviews, and reviews of previously published documents. According to this study, the proposed Boga Bridge construction will have some adverse environmental consequences including agricultural land and productivity loss, the decline of ecosystem health, extinction of endangered species, deterioration of water, air and soil quality, sedimentation and changes in river flow. Despite these adverse impacts this project will improve the life and livelihood of the coastal community and foster economic growth and industrialization over the long run through easily assessable road transportation. Additionally, the estimated overall environmental impact value (−2) and Leopold matrix's impact value (−1.51) revealed that this project has low adverse effects on the surrounding environment. Moreover, the majority of the environmental consequences were found to be transient because they were only limited to the construction phase which makes it simple to control with the proper implementation of appropriate mitigation strategies. Therefore, this study furnished some effective mitigation strategies incorporating mitigation hierarchy principals to avoid and minimize adverse impacts as well as enhance the positive impacts of this project. Finally, this study recommends constructing the proposed Boga Bridge after ensuring rigorous implementation and monitoring of all impact mitigation strategies proposed in this study.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call