Abstract

Incentives have played a major role in wind power development in Spain, having allowed the country to reach top worldwide positions in terms of wind power penetration but having also contributed to a structural cost-revenue unbalance. Feed-in tariff and premium schemes had been in force in Spain since the inception of wind power until the adoption of an auction-based support framework in 2016. So far, auctions have resulted in no incentives being allocated to any new wind farm. The present paper analyses the historical evolution of wind power support schemes in Spain and assesses the long run impact of the newly adopted policies on the future evolution of wind capacity and system costs through a behavioral stochastic System Dynamics model. Results show that the current lack of incentives will entail limited wind capacity growth, below the goal set in Spain's Renewable Energy Plan 2011–2020. Incentive levels required to meet specific goals in terms of capacity growth and system costs are computed and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.