Abstract

Hybrid steam power plant with geothermal feedwater preheating enables conversion of low temperature geothermal resources into electricity. The paper presents results of calculation of some performance parameters for 200 MWe fossil power unit associated with geothermal well. The paper gives separation rule of renewable energy from conventional one at hybrid power plant output. An influence of geothermal fluid temperature on hybrid power plant performance is discussed in a study and illustrated in several charts.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.