Abstract

A survey of medical information (MI) departments was conducted to gain an industrywide perspective of the launch process. In addition, a second survey was conducted that quantified activities during product launches at Solvay Pharmaceuticals, Inc. (Marietta, GA). Of the 52 initial companies invited to participate in the study, 26% (N = 14) provided responses. The majority of the surveyed teams consisted of two to three personnel from the MI department, and preparation activities began less than 3 months prior to launch. Overall, product launches at Solvay Pharmaceuticals required an average of 1.62 MI personnel and 52.6 hours of self-training. Activities began an average of 6 months prior to the expected launch date. While working on the launch team, MI personnel were responsible for an average of 2.25 additional products. Based on product launch experience at Solvay Pharmaceuticals, a formula was developed to estimate workload during future product launches at Solvay Pharmaceuticals.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.