Abstract

Combination of theoretical and numerical analysis, an assessment approach of shallow geothermal energy project is proposed. A case study on Chongqing is carried out to verify the methods. According to the theoretical calculation, the heat transfer power per meter of typical boreholes in Chongqing is 40 W/m for cooling and 50 W/m for heating. The numerical model of 100m borehole heat exchanger (BHE) of ground sourced heat pump (GSHP) system is built, two sets of heating and cooling loads are input to calculate the ground thermal response, the results show that the thermal unbalance ratio equals to 1.5 would ensure the safe and reliable long time operation of GSHP system. By comparing the single and group borehole model, the heat transfer efficiency of BHE is not influenced by adjacent boreholes with 6m drilling spacing, the temperature distribution among boreholes almost uniform after a year running, however, the increase of cumulative temperature of the ground reaches 2.2°C after five years running.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.