Abstract

Initial Water saturation is the water saturation of a reservoir before production commences. It enables the reservoir engineer to properly estimate the correct volume of Oil or gas reserves and to produce without water. And over the years over estimation or under estimation had caused major changes in the decision making of oil companies. New techniques are developed as technology advances to measure water saturation. These are the most widely used techniques for determining water saturation, nevertheless. Measurements obtained directly from a sealed core, which are more expensive, or calculations made using the Archie equation on sample well logs, which are less expensive. In this Project, Artificial Neural Network (ANN) model is the sole purpose of the modelling. The datasets are gathered, processed, trained, tested and validated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.