Abstract

Describes a production scheduler, which utilizes a hybrid push/pull approach to scheduling and exploits the expert system technology in order to obtain satisfactory solutions. The scheduler is applied to a multi‐stage production and inventory system, managed by make‐to‐order, with a large variety of incoming orders. The search for solution is made in respect of the due‐dates and under efficiency constraints (minimum lot, maximum storehouse levels, etc.). Considers order aggregation, both at portfolio and production level. Provides a dynamic rescheduling mechanism. Outlines theoretical arguments in favour of the scheduler and notes practical advantages as a consequence of the application of the scheduler in a firm which utilized a traditional despatching system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call