Abstract
This research work addresses the integrated scheduling of jobs and flexible (non-systematic) maintenance interventions in permutation flowshop production systems. We propose a coordinated model in which the time intervals between successive maintenance tasks as well as their number are assumed to be non-fixed for each machine on the shopfloor. With such a flexible nature of maintenance activities, the resulting joint schedule is more practical and representative of real-world scenarios. Our goal is to determine the best job permutation in which flexible maintenance activities are properly incorporated. To tackle the NP-hard nature of this problem, an artificial bee colony (ABC) algorithm is developed to minimize the total production time (Makespan). Experiments are conducted utilizing well-known Taillard’s benchmarks, enriched with maintenance data, to compare the proposed algorithm performance against the variable neighbourhood search (VNS) method from the literature. Computational results demonstrate the effectiveness of the proposed algorithm in terms of both solution quality and computational times.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.