Abstract

We study a novel rescheduling problem in which a set of jobs has been assigned an original schedule to minimize the total weighted completion time on a single machine, with the assumption but not with 100% certainty that all of them will be available when the planned processing begins. The need for rescheduling arises due to some jobs could not arrive in time; the decision-maker has to adjust the original schedule to account for the delayed jobs without causing excessive time disruption to the original schedule and to minimize their operational cost. While the decision-maker can choose to reject any of the delayed or non-delayed jobs, the total rejection cost and the tardiness of each accepted job in the adjusted schedule are strictly upper bounded by given thresholds, respectively. The total operational cost includes three components: the total weighted completion time of the accepted jobs, the total rejection cost of the rejected jobs, and the penalty on the maximum tardiness for the accepted jobs. We study this novel rescheduling problem from approximation algorithm perspective, as it generalizes several classic NP-hard scheduling problems; we design a pseudo-polynomial time dynamic programming exact algorithm and, when the total rejection cost is unbounded, we develop the exact algorithm into a fully polynomial time approximation scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.