Abstract
In this paper, a new predictive-reactive approach to a parallel machine scheduling problem in the presence of uncertain disruptions is presented. The approach developed is based on generating a predictive schedule that absorbs the effects of possible uncertain disruptions through adding idle times to the job processing times. The uncertain disruption considered is material shortage, described by the number of disruption occurrences and disruption repair period. These parameters are specified imprecisely and modelled using fuzzy sets. If the impact of a disruption is too high to be absorbed by the predictive schedule, a rescheduling action is carried out. This approach has been applied to solving a real-life scheduling problem of a pottery company.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.