Abstract
ABSTRACT This paper describes a heuristic approach to Production Facility siting and optimal pipeline routing to connect wells to Production Facilities. The pipe sizes for the production, lift gas and water injection systems were calculated and included in the optimization. Production Facility siting, based on production lines alone, is not optimal.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.