Abstract

ABSTRACT This paper describes a heuristic approach to Production Facility siting and optimal pipeline routing to connect wells to Production Facilities. The pipe sizes for the production, lift gas and water injection systems were calculated and included in the optimization. Production Facility siting, based on production lines alone, is not optimal.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call