Abstract
Increasing demand of fuel globally formulates gas as one of the most valuable natural resources. There is lot of uncertainties in estimating hydrocarbon volume correctly from exploration to development stage of a gas field. The accuracy and reliability of data (reservoir geological model, fluid and rock properties) make the implement very hard-hitting. So estimating and updating the gas reserve has become vital issue, as it helps the planners for drawing mid-term and long-term development plan from field development level to national level. This paper presents the study of reserve estimation of a Narshingdi Gas Field in Bangladesh. In this paper, a dynamic reservoir simulation model has been used to perform a history match ?pressure and production? using commercial simulator for reserve estimation. The result of this study is expected to provide Gas Initially in Place (GIIP) and recoverable gas volume. Simultaneously three forecast scenarios have also been investigated. There is no strong aquifer pressure support in the producing gas zone, so gas production continues from the reservoir due to pressure depletion.Journal of Chemical Engineering, Vol. 29, No. 1, 2017: 19-23
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.