Abstract
Abstract In this paper, the allocation, of eletric energy generated and shareout of investment of a large multi-purpose reservoir is considered.The allocation of the resources between the provinces involved should be equitable, otherwise, conflicts may occur. The mathematical model of the problem is formulated and the fuzziness of the concept—equity is treated by the Fuzzy Sets theory. An example is given to illustrate the appraoch proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have