Abstract
The simultaneous stochastic optimization of mining complexes optimizes various components of the related mineral value chain jointly while considering material supply (geological) uncertainty. As a result, the optimization process capitalizes on the synergies between the components of the system while not only quantifying and considering geological uncertainty, but also producing strategic mine plans, maximizing the net present value. This paper presents an application of simultaneous stochastic optimization at a large gold mining complex. The complex contains three open-pit mines, three stockpiles, a waste dump, and a processing facility. Material hardness management is integrated at the processing facility. The case study generated production schedules for each mineral deposit considered, as well as an overall assessment of the project and related forecasts. It resulted in an 18 year life-of-asset and identified the semi-autogenous grinder (SAG) mill as the bottleneck of the operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.