Abstract
Abstract The fast changes in the Market make companies increasingly focus on project structures. A project differs from a routine activity because it is unique and must be managed and structured to provide expected benefits at no greater cost than anticipated. Therefore, it must be planned and controlled by identifying the deviations between the planned and the accomplished. In order to provide this monitoring, Earned Value Management (EVM) has been increasing accepted. In addition to showing indicators of progress, EVM can be used to forecast the project's final costs through simulated scenarios. This work aims to integrate and apply EVM with Monte Carlo simulation to predict the final costs of three detailed engineering projects, evaluating the performance of the model and the projects, in each specific case study. The results of the three projects simulations were evaluated in a qualitative and comparative way, showing that the integration between the tools generates useful forecasts for project management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.