Abstract

We have developed an analytic platform to analyze the electricity options, costs, and impacts for Kosovo, a nation that is a critical part of the debate over centralized versus distributed electricity generation and the role of fossil fuels versus cleaner electricity options to meet growing demands for power. We find that a range of alternatives exists to meet present supply constraints all at a lower cost than constructing a proposed 600 MW coal plant. The options include energy efficiency measures, combinations of solar PV, wind, hydropower, and biomass, and the introduction of natural gas. A 30 EUR ton–1 shadow price on CO2 increases costs of coal generation by at least 330 million EUR. The results indicate that financing a new coal plant is the most expensive pathway to meet future electricity demand.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.