Abstract

Piling Foundation is one of the foundations which is used to penetrate its load through soil layer. The power carried by the piling is obtained from the end bearing capacity, that is, the compressive end piling and friction bearing capacity obtained from friction bearing and adhesive capacity between the piling and the soil around it. The investigation on the Standard Penetration Test is aimed to get the description of soil layer, based on the type and color of soil through visual observation, and soil characteristics. SPT data can be used to calculate bearing capacity. Besides investigating the SPT, this study is also been equipped by taking the samples in laboratory and loading test on the piling and Ducth Cone Penetrometer (DCP) data to confirm its bearing capacity.This study analyzed bearing capacity and settlement in the square pile of 40X40 cm in diameter in a single pile or grouped, using an empirical method, AllPile program, Plaxis program, and comparing the result with interpreting its loading test in the foundation of Rusunawa project, Jatinegara, Jakarta. The analysis was been done by using the data on soil investigation and laboratory by comparing them with Mohr-Coulomb soil model.Ultimate bearing capacity from the SPT data in the piling of 15.4 meters was 189.81 tons and the parameter of soil shear strength was 198.67 tons. The sander point, based on Aoki and De Alencar bearing capacity was 276.241 tons and based on Mayerhoff it was 305.49 tons. Based on the loading test of bearing capacity, unlimited bearing capacity for the three methods was Davisson (260 tons), Mazurkiewich (270 tons), and Chin (250 tons). The efficiency of grouped piles according to Converse-Library Equation method = 0.73, according to Los Angeles Group Action Equation method = 0.59, and according to Sheila-Keeny method = 0.94. Bearing capacity based on piling strength was 221.76 tons, bearing capacity based on calendaring data was 201.71 tons, and lateral bearing capacity of a single piling foundation was 129.6 kN (12.96 tons). When the maximum load (280 tons) was been given, more decrease occurred in the Maintained load test of 21.00 mm and Quick Load Test method of 20.67 mm, compared with the result of Load Test in the field of 18.74 mm. Based on ASTM D1143/81, the permitted value was 25.40 mm. Therefore, based on that decreasing, it could be concluded that foundation piles were safe in the construction. The pore water pressure is highly influenced by time so that in Maintained Load Test and Quick Load Test, there was the disparity in the level of pore water pressure. Based on the result of the calculation, Quick Load Test showed that in pore water pressure was dissipated in its acceleration.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call