Abstract

PurposeThis study aims to evaluate how stakeholders affect project risks by analyzing the connection between stakeholder management and risk management in the information technology (IT) project context.Design/methodology/approachUsing the Delphi method, interviews with IT project experts were conducted to examine four factors concerning stakeholder management and define probabilities for three risk variables. The design of experiments (DoE) method was applied for the design of the research instrument and data analysis.FindingsStakeholder engagement and communication with stakeholders have significant influence on the occurrence of negative risks, opportunities and the development of contingency strategies. These results provide project leaders with relevant data that better guide actions toward stakeholders and enhance project success probability.Originality/valueThis study clarifies important aspects of two main project management areas – stakeholder and risk management – in the IT projects context. This research also presented an unusual application for the DoE method which allows the subjective variables analysis by statistical tools and enables to explore factor influences on real project situations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.