Abstract

Faculty of Mechanical Engineering, Universiti Teknologi Malaysia, Skudai, MalaysiaHeat treatment of ballast water is one of the many treatment options being explored. This analysis has tried to assess the heat availability from the cooling water, exhaust gases of the engines and steam condensers based on design and operational data obtained from an existing crude oil carrier. Time requirements for ballasting and treatment using the seawater and condenser circulating pumps are projected. Heat balance exercises were also carried out on a testbed engine to verify attainable heat recoveries. It is seen that, although considerable heat is available, a longer time than that available during ballasting and normal ballast passages will be required for the treatment process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.