Abstract

An alternate model is presented when preordering constraints are imposed in the short term scheduling of batch plants. The idea is to include the assumption of preordering of orders to units in the underlying representation for the model, as opposed to including preordering as a separate set of constraints. The resulting model not only is conceptually simple but also results in shorter solution times.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.