Abstract
The work presented here is related to the area of optimal preventive maintenance (PM) scheduling in semiconductor manufacturing systems. Specifically, we develop models and algorithms to convert PM task schedules based on the count of wafers processed into equivalent calendar PM schedules. These equivalent calendar-based tasks can then be used within an optimization algorithm for PM scheduling. We propose a discrete mathematical model and an algorithm to convert from wafer-count targets into equivalent calendar dates. An extension of this model and algorithm is presented to perform conversions of other types of PM's, such as those based on processing time or energy spent, into equivalent calendar-based PM's.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.