Abstract

This study presents an algorithm for efficient scheduling in terms of total flow time and maximum earliness. All the algorithms in the literature for solving this problem are based on heuristic procedures, and cannot necessarily generate all efficient schedules. This study shows that this problem can actually be solved in pseudo-polynomial time, and develops an algorithm for so doing. The complexity of the algorithm is O (n2p̄ log n). Its computational performance in solving problems of various sizes is determined.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.