Abstract

This paper proposes an algorithm for hoist scheduling problems in a flexible PCB electroplating line where there is no buffer among workstations. Due to its chemical process nature, the processing times have to be controlled within a specified range (i.e. between a maximum processing time and a minimum processing time). The product will become defective if this constant is violated. The objective is to maximize throughput with no defective product. The proposed algorithm schedules jobs entering the system based on the specified range of processing time. A simulation study shows that the proposed algorithm outperforms the basic algorithm that schedules jobs based on the minimum processing times.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.