Abstract
Ideally, railway crew planning rosters should draw as little as possible on available crew resources. Methods of crew route scheduling with the evaluation criterion of the total number of required days have been studied because it could not be determined the number of required crews out exactly at the time of setting it up. However this method for compiling crew route schedules has made roster scheduling more difficult. This paper therefore proposes a crew route scheduling method with the evaluation criterion of the estimated number of required crews and shows its effectiveness for this problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.