Abstract
In industries such as aircraft or train manufacturing, large-scale manufacturing companies often manage several complex projects. Each of these projects includes multiple tasks that share a set of limited resources. Typically, these tasks are also subject to time dependencies among them. One frequent goal in these scenarios is to minimize the makespan, or total time required to complete all the tasks within the entire project. Decisions revolve around scheduling these tasks, determining the sequence in which they are processed, and allocating shared resources to optimize efficiency while respecting the time dependencies among tasks. This problem is known in the scientific literature as the Resource-Constrained Project Scheduling Problem (RCPSP). Being an NP-hard problem with time dependencies and resource constraints, several optimization algorithms have already been proposed to tackle the RCPSP. In this paper, a novel discrete-event heuristic is introduced and later extended into an agile biased-randomized algorithm complemented with an adaptive capability to tune the parameters of the algorithm. The results underscore the effectiveness of the algorithm in finding competitive solutions for this problem within short computing times.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.