Abstract

This article is about a multi-agent based algorithm for personnel scheduling and rescheduling in a dynamic environment of a paced multi-product assembly center. The purpose is first to elaborate daily employees' assignment to workstations so as to minimize the operational costs as well as personnel dissatisfactions; the second is to generate an alternative planning when the first solution has to be rescheduled due to disturbances related to absenteeism. The proposed approach takes into account individual competencies, mobility and preferences of each employee, along with the competency requirements associated with each assembly activity, with respect to both the current master assembly schedule and the line balancing for each product. We use solutions obtained through a simulated annealing algorithm in order to benchmark the performance of the multi-agent approach. Experimental results show that our multi-agent approach can produce high-quality and efficient solutions in a short computational time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.