Abstract

The extensive population growth calls for substantial studies on sustainable development in urban areas. Thus, it is vital for cities to be resilient to new situations and adequately manage the changes. Investing in renewable and green energy, including high-tech hydrogen infrastructure, is crucial for sustainable economic progress and for preserving environmental quality. However, implementing new technology needs an effective and efficient risk assessment investigation to minimize the risk to an acceptable level or ALARP (As low as reasonably practicable). The present study proposes an advanced decision-making framework to manage the risk of hydrogen refueling station leakage by adopting the Bow-tie analysis and Interval-Value Spherical Fuzzy Sets to properly deal with the subjectivity of the risk assessment process. The outcomes of the case study illustrate the causality of hydrogen refueling stations' undesired events and enhance the decision-maker's thoughts about risk management under uncertainty. According to the findings, jet fire is a more likely accident in the case of liquid hydrogen leakage. Furthermore, equipment failure has been recognized as the most likely cause of hydrogen leakage. Thus, in order to maintain the reliability of liquid hydrogen refueling stations, it is crucial that decision-makers develop a trustworthy safety management system that integrates a variety of risk mitigation measures including asset management strategies.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call