Abstract

AbstractIn this paper, we study the group shop and the mixed shop scheduling problems with single and identical parallel machines at each workstation with the makespan criterion. We adapted a constraint programming formulation previously presented for the classical resource‐constrained project scheduling problem. The effectiveness of our approach is evident in the fact that it achieved optimality in 107 out of 130 classical group shop scheduling problem instances and in 320 classical mixed shop scheduling problem instances. In the last set, we obtained 13 new optimal solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.