Abstract
Following the closure of Wheal Jane Mine in 1991, the mine water was allowed to recover and flood the mine workings. In 1992 a release of contaminated, acidic metal-rich (i.e., Fe, Zn, As, Mn, Al, Cu, Cr and Cd) mine water discharged into the River Carnon; in turn, this flowed into the Fal Estuary, causing a large, visual plume within the estuary at Falmouth. After this pollution incident, the National Rivers Authority (later part of the Environment Agency) established a temporary treatment plant and initiated the process of developing a long-term treatment plant. In 2000, the current active mine water pumping and treatment plant was completed, and operations started to remove the contaminants through chemical (lime) dosing using a series of treatment tanks. Prior to April 2011, this operational aspect of the plant was managed, under contract, by the Environment Agency. Since its inception in 1994, the Coal Authority has constructed and currently operates over 60 mine water remedial schemes for treating contaminated coal mine water. In 2011 the Authority was granted permission to take on work regarding non-coal types of mine water, which led to its managing the Wheal Jane Scheme on behalf of the Environment Agency. The knowledge and expertise at the Coal Authority allowed for a much needed assessment of the existing pumping and treatment regimes at the plant in addition to investigating the wider mining catchment as a whole. The main focus of this assessment was to identify any cost savings and efficiencies, thereby making continuous improvements to the scheme and gaining additional wider knowledge for the site. To date, since 2011 the Coal Authority and Veolia Water have implemented changes resulting in lime savings of 7% and polymer savings of 30% whilst continuing to meet all environmental consents. In addition to this, the Authority has undertaken an appraisal of the geochemistry of the water and begun a regional monitoring network of shaft water levels within the catchment to aid understanding and enable future possible scenarios for the plant to be assessed. Currently the Authority envisages a future in which changes in the mine water pumping regime could result in pumping less water and, in the long term, the establishment of a passive treatment scheme. This would ultimately reduce the financial burden of both active treatment and pumping. The Wheal Jane mine site sits within a larger catchment, which in part is drained by the Great County Adit. The discharge from the County Adit also flows in to the River Carnon, causing additional environmental issues. Together with the scheme at Wheal Jane, the investigations undertaken by the Coal Authority could also see some improvements being made to metal contamination originating from the County Adit.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.