Abstract

AbstractThis paper presents a new cost allocation method developed for estimating the fully‐allocated costs of the excess peak hour bus transit service provided by two public transit systems. The estimates were produced for the explicit purpose of carrying out a realistic comparison of these costs and the costs of the potential provision of the same service by private operators. The method utilizes the same service data for the analysis. The pragmatic estimation of the fully allocated costs of service by the public and private sectors enables a more accurate estimation of potential cost savings. Sensitivity analysis was also performed using the same costing procedure to determine the range of cost savings that are feasible in a competitive contract arrangement of private sector providers. The new method separates costs of the direct provision of service from other indirect costs and thus facilitates the identification of each cost item and its significance in comparative cost estimates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call