Abstract

The objective of the study was to investigate the nitrification process, as well as the bio-chemical removal of cyanate and thiocyanate, while treating gold mining wastewater using an aerobic up-flow SAGR. A total of six SAGRs, each packed with locally sourced pea gravel (estimated specific surface area of 297m-2m-3), were operated at various HRTs and tested on both low- and high-strength gold mining wastewaters. The two sets of three SAGRs were operated at HRTs of 0.45 days, 1.20 days, and 2.40 days. Nitrification was successfully achieved in all six SAGRs regardless of the wastewater strength or HRT examined. The steady-state, 20°C surface area loading rate was determined to be 1.2g-TAN m-2 d-1 in order to comply with an effluent discharge limit at 10mg-TAN L-1 (i.e., with the wastewater sources examined). At all ammonia loading rates, thiocyanate was successfully removed, and residual concentrations were below 2mg-SCN-N L-1. Cyanate appeared to be hydrolyzed and subsequently nitrified. Acute toxicity tests conducted on both daphnia and trout revealed the effluent to be safe for direct discharge.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.