Abstract
Today’s market is in a constant flux of demand changes. Due to this the product demand and the product mix continuously change from one time-period to the next. For a company to be profitable and competitive, it has to ensure that all of its resources are optimally utilized. These resources include facility layout, material handling, and production system. Previous research has shown that the system state has to be identified prior to increasing capacity to mitigate the constraint. As the demand and product mix change, a facility layout that was efficient can soon become inefficient or the cost of production and material handling increase. This research evaluates usage of alternate part sequence as a means to eliminate or reduce production system constraints. It focuses on reducing machine usage when the selected process sequence leads to production capacity constraints.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.