Abstract

Objective - Analysed alternativemanagement of erosionandsedimentinWanggu River .Type.This study was theoretical testing in analysing the research subject. Methodology/Technique - Literature review analyse. Findings - This study result showed that socialization, understanding andpublic awareness were needed in maintainingthe continuity the functionsandexistence of Wanggu River. Some Hydraulic structures that could be alternative management of erosion and sediment: Temporary Slope Drains, Riprap Downspout, Silt Fence Sediment Barrier and Erosion Control Blanket Slope Application. Novelty - The location of this study and modelling plan of erosion and sediment management Type of Paper - Conceptual Keywords: Erosion;Sediment;Alternatives Management;Estuary;Wanggu River ;Hydraulic Structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.