Abstract

AbstractSchedule nervousness caused by uncertainty in demand or supply or by dynamic lot‐sizing can be an obstacle to effective execution of material requirements planning (MRP) systems. Previous studies on the effectiveness of alternative approaches for dampening nervousness almost always considered single‐level product structures and deterministic demand conditions. This study evaluates the effectiveness of three strategies for reducing nervousness in multi‐level MRP systems under demand uncertainty: (1) freezing, (2) end‐item safety stock, and (3) lot‐for‐lot scheduling below level 0. The strategies are evaluated under a wide range of operating conditions characterized by variations in item cost structure, product structure, demand uncertainty, and lot‐sizing methods used. A multi‐level MRP system is simulated to study the relative performance of the three strategies. Results indicate that freezing the master production schedule is the most effective approach in terms of reducing both instability and cost as the freeze length covers the cumulative lead time. It is also the least sensitive to changes in operating conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.