Abstract

This paper describes the design and construction of a 30,000 DWT to 60,000 DWT capacity tanker loading facility constructed in Cook Inlet, Alaska for year-round operations. Particular emphasis is placed on the environmental conditions and resulting design criteria which led to the conception of the unique structure. Large diameter steel tubes, supported by underwater bracing, were used as the main structural members which extended through the ice zone. A movable fender system was designed to remain a few feet above the water level and thus provide a uniform fendering capability at all tidal levels without exposure to ice damage. The dock components were prefabricated in large units to reduce on-site work to a minimum.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.