Abstract

The features of a new type of continuous bridge suspended by triangle frame are introduced in this paper. In view of the segmental cantilever construction method engaged in main girder construction, we put forward to the method of pre-camber setting and the calculation of formwork elevation and field measurement of displacement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call