Abstract
In this paper, we consider the wafer probing scheduling problem (WPSP) to sequence families of jobs on identical parallel machines with due date restrictions. The machine set-up time is sequentially dependent on the product types of the jobs processed on the machine. The objective is to minimize the total machine workload without violating the machine capacity and job due date restrictions. The WPSP is a variation of the classical parallel-machine scheduling problem, that can be transformed into the vehicle-routing problem with time windows (VRPTW). One can therefore solve the WPSP efficiently using existing VRPTW algorithms. We apply four existing savings algorithms presented in the literature including sequential, parallel, generalized, and matching based savings, and develop three modifications called the modified sequential, the compound matching based, and the modified compound matching-based savings algorithms, to solve the WPSP. Based on the characteristics of the wafer probing process, a set of test problems is generated for testing purposes. Computational results show that the three proposed modified algorithms perform remarkably well.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.