Abstract
We investigate the semi-online problem of MapReduce scheduling on two parallel machines. We aim to minimize the makespan. Jobs are released over-list, and each job includes a map task and a reduce task. The job’s map task can be preemptive and scheduled simultaneously onto different machines, however, the reduce task is non-preemptive. The job’s reduce task needs to wait for its map task to complete before starting. We consider the following two versions: Firstly, we know the processing time of the largest reduce task beforehand, and then design a 4/3-competitive optimal semi-online algorithm. Secondly, we know in advance the value of the reduce task with the largest processing time and the the total sum of the processing times. Then we present a 4/3-competitive semi-online algorithm. We conclude that the algorithm is the best possible when the largest reduce task meets certain conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.