Abstract
The article is concerned with control methods that have been embedded in an industrial model predictive control software package and that have been applied to a wide variety of industrial processes. Three methods are described and the various features are evaluated by considering a constrained multivariable simulation. One method has been in use since 1988 and is widely exploited in industry. The latest methods employ quadratic programming, which has become realistic to employ because of the advances in computing. The relative attributes are contrasted by assessing the ability of the controllers to recover effectively from the impact of a large unmeasured disturbance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.