Abstract
The problem considered is to transfer ballast (water) between ballast tanks in an offshore production platform in a fast and efficient way, and at the same time maintain certain criteria regarding the platform’s safety, stability and strength. In case of an emergency situation, the algorithm must return a solution in short time. Two alternative algorithms are evaluated; one mixed integer programming (MIP) model and one heuristic algorithm. It is shown that the much simpler heuristic algorithm yields satisfactory solutions in almost no time, while the MIP model takes up to several minutes to come to a solution. The heuristic algorithm is installed in control systems for a platform operating in the North Sea and the experience so far has been good.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.