Abstract

We address the problem of determining schedules for static, single-machine scheduling problems where the objective is to minimize the sum of weighted tardiness and weighted earliness. We develop optimal and heuristic procedures for the special case of weights that are proportional to the processing times of the respective jobs. The optimal procedure uses dominance properties to reduce the number of sequences that must be considered, and some of the heuristic use these properties as a basis for constructing good initial sequences. A pairwise interchange procedure is used to improve the heuristic solutions. An experimental study shows that the heuristic procedures perform very well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.