Abstract
Abstract Network planning technology could be used to represent project plan management, such Critical Path Method (CPM for short) and Performance Evaluation Review Technique (PERT for short) etc. Aiming at problem that how to find hypo-critical path in network planning, firstly, properties of total float. free float and safety float are analyzed, and total float theorem is deduced on the basis of above analysis; and secondly, simple algorithm of finding the hypo-critical path is designed by using these properties of float and total theorem, and correctness of the algorithm is analyzed. Proof shows that the algorithm could realize effect of whole optimization could be realized by part optimization. Finally, one illustration is given to expatiate the algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.