Abstract

An evaluation of airborne lead exposure was conducted during abatement of a building as part of its demolition. Personal airborne exposure concentrations were collected over 29 working days. These results suggest, for this study, that exposure levels are highly variable, exhibit a nonnormal distribution and fre quently exceed the Occupational Safety and Health Administration Permissi ble Exposure Limit for lead. Various engineering and work practice controls were employed during this project to reduce exposure levels, although the con tractor did at times employ prohibited practices. Exposure results from this study suggest that lead abatement workers involved in demolition are not a homogenous group for sampling purposes. Studies are needed to evaluate engineering controls, work practices and worker exposure to airborne lead during abatement of buildings that are being demolished.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.