Abstract

Some industrial crane control panels were historically equipped with chrysotile-containing arc chutes. Because of the paucity of data regarding potential exposure from such equipment, we used a simulation approach to quantify the release of chrysotile from arc chutes in two functional 1970s-era industrial crane control panels during operation and maintenance. Two experienced operators separately simulated operation of crane controls under load; one of these operators then simulated two arc chute maintenance protocols: sanding (protocol 1) and scraping, sanding, and blowing (protocol 2). The original arc chutes contained approximately 36% chrysotile. Personal breathing zone (PBZ) (n = 8) and area samples (n = 8) were collected and analyzed using phase contrast microscopy (PCM) and transmission electron microscopy. PCM-equivalent (PCME) concentrations were derived, from which 8-h time-weighted averages (TWA) were calculated. During operation, chrysotile was identified in one of the four PBZ samples, equivalent to a PCME concentration of 0.012 f/cm3 (8-h TWA: 0.011 f/cm3). During protocols 1 and 2, chrysotile was identified in all PBZ samples (n = 4); PCME concentrations (and corresponding 8-h TWA) were <0.013 and 0.021 f/cm3 (0.001 and 0.004 f/cm3) and 0.013 and 0.017 f/cm3 (0.003 f/cm3), respectively. Many of the airborne chrysotile fibers had matrix attached, supporting the low exposure potential during this work. These data indicate very low, if any, exposures to chrysotile asbestos during the simulated scenarios. In addition, these data could assist with refining assumptions in exposure reconstruction and inform the state-of-the science on low-level chrysotile exposure.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call