Abstract

In the fall of 1995, we successfully completed a major milestone in the RHIC (Relativistic Heavy Ion Collider) project: the first beam test of the AGS (Alternating Gradient Synchrotron) to RHIC (ATR) transfer line. The ATR serves as a test bed for the new RHIC control system. This transfer line is highly instrumented, with several types of instrumentation for characterizing the extracted beam from AGS and for matching the beam into RHIC. We describe the design and performance of ATR with gold ions with an eye to reaching the design criteria for RHIC operation, both in beam quality and controls.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.