Abstract

ABSTRACT Customers are looking for suppliers to deliver complex systems at faster rates, targeting three year cycle. This timeframe is challenging for low Technology Readiness Level (TRL) developments, increasing requirements engineering effort, leaving engineers little time and scope for innovation. Test and Evaluation (T&E) activities are often performed in Australia near the end of the process diminishing their value , compensating for a lack of modelling and simulation in early stages. Waterfall Project Management dominates where capability is hardware focused, leading to overruns and deliver capability that falls short of customer expectations in some areas. The Agile approach has been successfully used in software-focused developments. Project managers have been slow to adopt Agile for developments in areas like Defence where the safety is hardware dominant claiming the Agile process lacks necessary governance , increasing risk in the development. This paper examines the extant developmental process in a Defence context and proposes a Minimal Viable Product (MVP)-based framework using Agile to accelerate the development and mitigate risk escalation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.