Abstract
In this paper we suggest an integrated planning and scheduling framework with a special emphasis on the link between these control levels. Our planning model is generated automatically by performing aggregation on de facto standard product and technology related data in the dimensions of time, resource capacities and operations. The method addresses make-to-order production environments. An industrial case study is also presented, demonstrating how our algorithms work on large-scale problem instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.