Abstract

An aggregate feasibility set for large electric power systems is derived. The feasibility aet consists of the set of snbstation loads that can be served in steadystate with the available generation without overloading the transmission lines or transformers. The derivation is based on an aggregate continuum model of large power systems that is obtained from the DC losad flow model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.